TRS1870MSFIdentification
- Object ID
- TRS1870MSF
- Long form
- TRS-1870-MSF-W20L43-01
- Construction
- steel portal frame hall, two aisles, frames with centre columns
- Description
- structure for a supermarket: tall main hall, lower wings, flat roof with parapet, canopies
- Hall passport no.
- HP-20261126-01
- Location
- exact location after qualification
Origin and documents
- Erected
- not erected – fabricated, unused
- Structural calc.
- original structural calculation 11/2018–01/2020, about 790 pages; loads to Eurocode 1 with National Annexes (edition 2010-12, as of 11/2018)
- Drawings
- 37 shop drawings (PDF and CAD), 3 position plans, quantity list (18 pages)
Geometry
- Dimensions
- main hall 20.26 × 42.76 m grid dimension (≈ 870 m²); roofed area in total approx. 1,870 m² (basis of the object ID)
- Bays
- 8 frame lines, 7 bays of 6.10–6.13 m; aisles 2 × 10.13 m; side wing 3 × 5.315 m
- Eaves / ridge
- main hall: eaves 6.28 m, ridge 6.49 m (top of steel), parapet 7.00 m; side wing: top of steel 4.23 m, parapet 4.88 m
- Roof pitch
- approx. 1.2–1.5°, shallow pitch with parapet
- Clear height
- below the rafters not dimensioned – to be measured on the structure
Structure
- Frames
- 8 steel frames in the main hall, two aisles with a centre column on line C; wings with their own frames
- Bracing
- roof and wall bracing of tube and bar sections
- Steel
- approx. 58 t per quantity list (05.02.2020), execution class EXC2; sections and grades as per calculation
- Connections
- bolted connections; long edge beams of the wings split for transport
Envelope and equipment
- Roof
- not part of the structure
- Doors / rooflights
- not part of the structure
Terms
- Price
- on request after qualification
- Availability
- by arrangement
- Scope
- steel structure with connection and fastening parts per quantity list
- Not included
- roof and wall envelope, doors, windows, foundations, floor slab, fit-out
- Status
- fabricated, never erected; documents available
Fabricated, but never erected
The structure was fabricated for a supermarket with a beverage store, storage and plant rooms. The project was not realised; according to the owner the structure has never been erected. The split into a tall main hall and lower annexes shows what the geometry is designed for: public access with a foyer and ancillary rooms.
- Two aisles: two aisles of 10.13 m each, separated by a row of columns on the centre line – shorter rafter spans, but not column-free.
- Tall and articulated: eaves 6.28 m, ridge 6.49 m, parapet 7.00 m; the lower wings (top of steel 4.23 m) take the entrance, ancillary rooms and plant.
- Documented: structural calculation (about 790 pages), 37 shop drawings as PDF and CAD, position plans and quantity list are available.
Dimensions at a glance
The object ID is derived from the system dimension of the roofed area (approx. 1,870 m²). All dimensions are taken from the construction documents; areas are derived from the drawings and rounded.
| Reference | Value | Note |
|---|---|---|
| Main hall | 20.26 × 42.76 m | ≈ 870 m², grid dimension |
| Aisles | 2 × 10.13 m | row of columns on line C |
| Frame bays | 7 × 6.10–6.13 m | 8 frame lines |
| Eaves / ridge | 6.28 / 6.49 m | top of steel; parapet 7.00 m |
| Side wing | 15.945 × 18.33 m | top of steel 4.23 m, parapet 4.88 m |
| Roofed area | approx. 1,870 m² | main hall, wings and canopies |
What is available and what is still being checked
Available are the structural calculation of about 790 pages (11/2018 to 01/2020), three position plans, 37 shop drawings as PDF and CAD and an 18-page quantity list. The exact scope of supply is still being clarified: the purchase item is the steel structure as per the quantity list; envelope, doors, foundations, floor slab and fit-out are not included. Some long edge beams of the wings were split for transport. The buyer checks the condition of the coating after storage during the inspection. We release the documents after a framework agreement has been signed. The drawings are labelled in German.


Range of application under the Eurocodes (indicative)
The original structural calculation assumes in its load determination (as of 11/2018) snow load zone 2 (ground snow load sk = 0.85 kN/m²) and wind zone 1 (basic velocity pressure qb,0 = 0.32 kN/m², building height 6.90 m) to Eurocode 1 with the National Annexes, edition 2010-12. Compared with the current National Annex (DIN EN 1991-1-3/NA:2019-04, DIN EN 1991-1-4/NA:2010-12), the German load zones give:
| Action | Zone | Limit | Classification |
|---|---|---|---|
| Snow | zone 1 | up to approx. 505 m a.s.l. | probably without strengthening |
| Snow | zone 1a | up to approx. 415 m a.s.l. | probably without strengthening |
| Snow | zone 2 | up to approx. 285 m a.s.l. | probably without strengthening |
| Snow | zone 2a | – | probably with strengthening |
| Snow | zone 3, North German lowlands | – | probably with strengthening |
| Wind | WZ 1 inland | 0.32 kN/m² | probably without strengthening |
| Wind | WZ 2–3 inland | 0.39–0.47 kN/m² | probably with strengthening |
The seismic action cannot be read from the available extracts and remains open. Foundations and anchorage are designed anew at the new site; the move to the second generation of Eurocodes will change the code basis in future. Usual strengthening measures, named but not designed: additional braced bays, closer purlin and side-rail spacing, knee braces, section reinforcement and lighter roof and wall cladding.
The information on the range of application and on possible strengthening measures is an indicative assessment based on the available documents. It does not replace a structural calculation. THAL REUSE SYSTEMS accepts no liability for it. Suitability for a specific site and the type and extent of any strengthening must be verified by a structural engineer appointed by the buyer.
Suitable second uses
Assembly and event space with ancillary rooms; community, club and education buildings; retail, showroom and car dealership; storage and production. Assembly spaces must meet the requirements of the respective assembly-venue regulations, for example on escape routes, fire protection and ventilation. The row of centre columns can be planned as a central aisle or room divider but limits free sightlines.
Steps to erection
The next step is a short framework agreement (TRS-FA); afterwards you receive the documents, the storage location and an inspection appointment. A licensed structural engineer confirms suitability for your site; the purchase decision should depend on that confirmation. Loading, transport and erection are to be considered separately from the purchase and can be carried out by the buyer or by qualified hall builders from the TRS partner network. Foundations, floor slab and envelope are designed by the buyer’s architect or structural engineer. As the structure has already been fabricated, there is no lead time for new steelwork.
Frequently asked questions
What does the hall cost? We quote the price on request after a short qualification.
Is there a structural calculation? Yes. The original calculation (about 790 pages, 2018–2020) is available, together with position plans, 37 shop drawings and a quantity list. Suitability for a new site must be verified by a licensed structural engineer.
Is the hall column-free? No. The main hall has two aisles: a row of columns on the centre line divides it into two aisles of 10.13 m each. It can be used as a central aisle or room divider.
Request documents
After qualification you receive location, exposé, hall passport and building documents. Please quote object ID TRS1870MSF.
Johann Thal · Founder THAL REUSE SYSTEMS
Phone +49 30 80584249 · sales@thalreuse.systems · thalreuse.systems
Would you like to sell a hall? Talk to us – we buy or find the right buyer through our network. Offer a hall →
All details are based on the construction documents and are given without warranty; dimensions and areas are approximate. Subject to prior sale. This article does not replace design, structural or permit checks at the new site.
Drawings: © THAL REUSE SYSTEMS